Kentucky Public Service Commission


View Case Filings for: 2019-00176


Case Number:2019-00176
Service Type:Radio - Telephone
Filing Date:6/7/2019
Category:Regular
Utilities:

New Cingular Wireless PCS, LLC


Electronic Case
Case Nature:

Dunnville Relo Site; : Antioch Road, Liberty, KY 42539









Case Filings
FilingDocuments
2/9/2022 2:56:31 PM

Order Entered: 1. AT&T Mobility’s motion for confidential treatment is granted. 2. The remainder of AT&T Mobility’s December 30, 2019 supplemental evidence filing shall be publicly disclosed. 3. The designated material granted confidential treatment by this Order shall not be placed in the public record or made available for public inspection for an indefinite period or until further Order of this Commission. 4. Use of the designated material granted confidential treatment by this Order in any Commission proceeding shall comply with 807 KAR 5:001, Section 13(9). 5. AT&T Mobility shall inform the Commission if the designated material granted confidential treatment by this Order becomes publicly available or no longer qualifies for confidential treatment. 6. If a nonparty to this proceeding requests to inspect the material granted confidential treatment by this Order and the period during which the material has been granted confidential treatment has not expired, AT&T Mobility shall have 30 days from receipt of written notice of the request to demonstrate that the material still falls within the exclusions from disclosure requirements established in KRS 61.878. If AT&T Mobility is unable to make such demonstration, the requested material shall be made available for inspection. Otherwise, the Commission shall deny the request for inspection.


1/21/2021 7:53:50 AM

Final Order Entered: 1. AT&T Mobility is granted a CPCN to construct a wireless telecommunications facility. The proposed facility consists of a tower not to exceed 237 feet in height, with attached antennas, to be located at 74 Antioch Road, Liberty, Casey County, Kentucky. The coordinates for the proposed facility are North Latitude 37°13'26.77? by West Longitude 84°57'18.92?. 2. AT&T Mobility shall immediately notify the Commission in writing if, after the antenna tower is built and utility service is commenced, the tower is not used for a period of three months in the manner authorized by this Order. 3. Documents filed, if any, in the future pursuant to ordering paragraph 2 herein shall reference this case number and shall be retained in the post-case correspondence file. 4. This case is closed and removed from the Commission’s docket.


12/15/2020 4:22:24 PM

ATT Mobilitys Response to SBA Public Comment Suggesting Rent Reduction on Existing SBA Tower


David A. Pike, F. Keith Brown and Christopher J. Shouse New Cingular Wireless PCS, LLC d/b/a ATT Mobility

Dunnville_Relo_-_Response_to_SBA_Public_Comment_Rent_Reduction_Offer.pdf

AT&T Mobility's Response to SBA Public Comment Suggesting Rent Reduction on Existing SBA Tower

12/4/2020 3:29:27 PM

SBA Communications Corporations Public Comment


Tia Combs SBA Communications Corporation

SBA_PublicCommentreRent.pdf

SBA Communications Corporation's Public Comment

4/28/2020 8:38:27 AM

Order Entered: 1. AT&T Mobility's request, via electronic mail, to convert this proceeding to an electronic case is granted. 2. Electronic filing procedures shall be followed, pursuant to 807 KAR 5:001, Section 8, for all filings in this case. 3. Parties shall upload an electronic version using the Commission's Electronic Filing System. 4. Pursuant to the Commission's March 16, 2020 and March 24, 2020 Orders in Case No. 2020-00085, parties shall not file an original paper copy of any documents in this proceeding until further order of the Commission. Upon an order lifting the current state of emergency, parties shall file original paper copies of electronic documents filed in this proceeding within 30 days of the lifting of the current state of emergency. 5. The style of this case is revised to read, "Electronic Application of New Cingular Wireless PSC, LLC d/b/a AT&T Mobility for Issuance of a Certificate of Public Convenience and Necessity to Construct a Wireless Communications Facility in the Commonwealth of Kentucky in the County of Casey." 6. Pursuant to 807 KAR 5:001, Section 8(9), within seven days of entry of this Order, AT&T Mobility shall file a written statement with the Commission that: a. Certifies that it, or its agent, possesses the facilities to receive electronic transmissions; and b. Sets forth the electronic mail address to which all electronic notices and messages related to this proceeding should be served.


12/30/2019

New Cingular Wireless PCS, LLC Motion for Confidential Treatment of Supplementary Evidence


20191230_New Cingular Wireless PCS, LLC Motion for Confidential Treatment.pdf

New Cingular Wireless PCS, LLC Motion for Confidential Treatment

12/30/2019

New Cingular Wireless PCS, LLC Filing of Real Estate Value Impact Study


12/30/2019

New Cingular Wireless PCS, LLC Memorandum in Support of Grant of Certificate of Public Convenience and Necessity


12/30/2019

New Cingular Wireless PCS, LLC Kentucky Airport Zoning Commission Approval Letter


12/3/2019

Order Entered nunc pro tunc that: 1. Ordering Paragraph 2 of the Commission November 22, 2019 Order is amended as follows: The local public hearing shall be held at the Casey County Library, Community Room, 238 Middleburg Street, Liberty, Kentucky 42539, a


11/22/2019

Order Entered: 1. A local public hearing is convened for the purpose of taking public comment on AT&T Mobility's Application for a CPCN to construct a wireless telecommunications facility to be located at 74 Antioch Road, Liberty, Kentucky 42539. 2. The lo


10/1/2019

Order Entered: Mr. and Ms. Hoskins and Ms. Wahl's request to intervene is denied.


10/1/2019

Order Entered: SBA's request to intervene is denied.


8/14/2019

New Cingular Wireless PCS, LLC Response to Request for Public Hearing


8/13/2019

Response to Protest letter


8/13/2019

Response to Protest letter


8/13/2019

Response to Protest letter


8/8/2019

Elwood Hoskins, Susan Hoskins, and Mandy Wahl Reply to New Cingular Wireless PCS. LLC Response to Motion to Intervene


8/1/2019

New Cingular Wireless PCS, LLC Response to Motion to Intervene


7/8/2019

SBA Communication Corporation Reply to New Cingular Wireless PCS, LLC Response


7/2/2019

New Cingular Wireless PCS, LLC Response to SBA Communications Corporation Motion to Intervene


7/2/2019

Response to Protest letter


7/2/2019

Response to Protest letter


7/2/2019

Response to Protest letter


20190702_PSC Response Letter to Hoskins01.pdf

20190702_PSC Response Letter to Hoskins.pdf

7/2/2019

Response to Protest letter


7/2/2019

Response to Protest letter


7/2/2019

Response to Protest letter


6/25/2019

SBA Communications Corporation Motion to Intervene


6/13/2019

No deficiency letter


6/7/2019

New Cingular Wireless PCS, LLC d/b/a AT&T Mobility Application for Issuance of a Certificate of Public Convenience and Necessity to Construct a Wireless Communications Facility in the Commonwealth of Kentucky in the County of Casey


20190607_New Cingular Wireless PCS, LLC Application.pdf

New Cingular Wireless PCS, LLC Application

6/7/2019

Acknowledge Receipt of Filing